Case Study: London South Bank University

Case Study: London South Bank University

6 August 2023 1:00 pm - 1:45 pm Retrofit Agenda

An existing 1970s concrete-framed structure has been transformed into the LSBU Hub, an open, welcoming centrepiece for their campus at Elephant & Castle in inner South London.

By retaining the existing structure the total embodied carbon has been calculated at 375 kgCO2e/m2which is a 40% reduction compared to a new build equivalent. This reduction is extended to 70% for the structural elements of the scheme.

The “deep renovation” offers an uplifting impression to contemporary students, staff and the surrounding community; creating a light and open environment in complete contrast to the character of the old building. Through adaptive re-use the design shows what can be possible within the constraints of an outdated 70’s concrete structure, and offers a template for the future-proofing of similar buildings.

Chairperson

Tom Dollard Tom Dollard, Partner, Pollard Thomas Edwards

Speakers

Lucy Townsend Lucy Townsend, Head of Sustainability, BDP
Nat Keast Nat Keast, Associate Director, Wilkinson Eyre
Stephen Balls Stephen Balls, Deputy Director of Estates & Development, London South Bank University
Toby Ronalds Toby Ronalds, Director, Eckerlsey O'Callahan